Covered under Standard Installation
Standard installation charges are to be paid directly to the brand authorized technician at the time of installation.
Please check the offer details section to know about any installation offers that are available
1) Drilling of holes into a brick wall for taking out the pipes
2) Fixing a hole sleeve & Cap.
3) Fixing & Connecting indoor and outdoor units using the standard Kit provided by the manufacturer.
Not Covered under Standard Installation
- The below items are not covered under standard installation and will incure additional charges as availed basis need or request
- Outdoor unit stand -INR Rs. 950-1250.
- Extra copper wire – Rs. 850 + GST per metre
- Drain pipe extension- Rs. 80- 110 per metre.
- Wiring extension from the meter to the installation site.
- Vinyl tape roll.
- Dismantling/shifting of the old AC’s – Rs.800 -1000
- Closing the holes with White Cement – on Actuals
- Stabilizer
- Plumbing and masonry work.
- Power-point/MCB fitting and any other electrical work
- Carpentry work
- Core cutting fabrication and electrical.
- Note: we highly recommend to use standard & authorized accessories Only.
- In case customer arranges accessories by his own, Brand Service Engineer refuse &/or ask for labour charges for fixing these accessories.
- Ladder / arrangement for safe working stand, to be arranged by customer in case required at installation site
- Any extra copper pipe length that might be needed for installation (as per site requirement) beyond the copper pipe supplied with the product (as per model) and the labour charges for laying this additional copper pipe cost will be borne by customer. If copper pipe supplied by customer, any leakage from copper pipe is in customer’s scope and labor charges applicable for laying refrigerant pipe @200/- per mtr. is applicable.
- Concealed piping civil work not included in above price
- Grill / Glass cutting and welding work to be organized by customer from their side, as per the requirement
- In case piping is pre-laid by customer during construction stage, then nitrogen pressure testing will be required after connecting outdoor and indoor units. The cost of the same to be borne by customer.
- If site is prone to corrosion, anticorrosion coating is recommended and it will be charged extra as applicable.
- Anything else not covered in standard installation will be chargeable extra.